St. Jude Maronite Catholic Church
Project Description
St. Jude Maronite Catholic Church is a 9,600-SF two-story sanctuary and fellowship hall on a 1.35 acre site in the Dr. Phillips area of southwest Orange County, Florida.
Responsibilities
- Special Exception and other zoning approvals through Orange County.
- Preparation of civil engineering construction documents for all site improvements.
- Sanitary sewer lift station design and permitting.
- Extensive grading work due to significant grade changes and limited site area.
- Preparation of landscape and irrigation plans.
- Coordination with owner representatives, governmental agencies, architects, surveyors, other consultants and contractors.
- Permitting of the site improvements through Orange County, South Florida Water Management District and Florida Department of Environmental Protection.
- Construction administration including site inspections, as-built preparation, and as-built certifications.
South Orlando YMCA
Project Description
The South Orlando YMCA project consisted of a retrofit to the main YMCA building, which houses a gymnasium, a wellness center and other related sports facilities. The site area subject to retrofit was approximately 1.8 acres. Improvements consisted of demolition and re-construction of a portion of the main YMCA building, interior building improvements, re-configuration and improvements to the parking area, and re-configuration of existing drainage.
Responsibilities
- Special Exception review and coordination with Orange County Zoning Department.
- Preparation of civil engineering construction documents for all site improvements.
- Preparation of landscape and irrigation plans.
- Coordination with owner representatives, governmental agencies, architects, surveyors, other consultants and contractors.
- Permitting of the site improvements through Orange County, St. Johns River Water Management District, Orlando Utilities Commission, and Florida Department of Environmental Protection.
- Construction administration including site inspections, as-built preparation, and as-built certifications.
Sanctuary of Praise Ministries
Project Description
Sanctuary of Praise Ministries consists of a multi-phase 15.64 acre church campus in the City of Orlando, Florida. The early phases included two 1,600-seat sanctuary buildings totaling 36,500 S.F., a 29,710 multi-use retail, office and eating establishment church support facility, and a 3.2-acre overflow parking lot. The project required a small extension of Corporate Boulevard.
Responsibilities
- Master planning of drainage system and utility infrastructure for the entire development.
- Preparation of civil engineering construction documents for the site improvements for all phases of construction.
- Preparation of landscape and irrigation plans for all phases of construction.
- Coordination with owner representatives, governmental agencies, architects, surveyors, other consultants and contractors.
- Permitting of the site improvements through the City of Orlando, South Florida Water Management District, and Florida Department of Environmental Protection.
- Construction administration including site inspections, as-built preparation, and as-built certifications.
Lake Mary Preparatory School - Phase II
Project Description
Phase II of the Lake Mary Preparatory School was an expansion of classrooms and athletic facilities on an existing 11.3-acre private school campus in Lake Mary, Florida. The project involved construction of a new 22,000-SF two-story classroom building as well as several athletic facilities, which included a pool for swimming and diving, a track and football field with bleachers and concession facilities, a baseball field, tennis courts, an outdoor basketball court and a playground.
Responsibilities
- Master site planning.
- Design and permitting of a preliminary development plan.
- Preparation of civil engineering construction documents for all site improvements.
- Preparation of landscape and irrigation plans.
- Coordination with owner representatives, governmental agencies, architects, surveyors, other consultants and contractors.
- Permitting of the site improvements through the City of Lake Mary, St. Johns River Water Management District, and Florida Department of Environmental Protection.
- Construction administration including site inspections, as-built preparation, and as-built certifications.